EPSRC FINAL REPORT - June 2004

The findings from the PODDS project, detailed to the EPSRC in the final report June 2004, is provided here.

PODDS SEMINAR - AWS & YWS 19th August 2004

The findings from the PODDS project as presented at the Discolouration Seminar held near Newark on the 19th May 2004 for Anglian water Services and Yorkshire Water Services are provided here.

PODDS SEMINAR - UKWIR 25th MAY 2004

The findings from the PODDS project as presented at the Discolouration Seminar held in London on the 25th May 2004 are provided here.

A poster has been produced to help explain the aims and objectives of this research, including the companies involved and initial work.

MID-PROJECT REPORT

A report providing details of the major findings from the first half of this research project, providing specific details for industrial tools that can be distilled from the knowledge gained.

 

 

MINUTES FROM STEERING GROUP MEETINGS

Preliminary meeting 30th November 2000, minutes

First meeting 10th April 2001, minutes, presentation

Second meeting 17th July 2001, minutes, presentation

Third meeting 27th November 2001, minutes, presentation

Fourth meeting 2nd May 2002, minutes, presentation

Fifth meeting 14th August 2002, minutes, presentation

Sixth meeting 3rd December 2002, discussion document, minutes, presentation

Seventh meeting 5th March 2003, minutes, presentation

Eigth meeting 3rd July 2003, minutes, presentation

Ninth meeting 23rd September 2003, minutes, presentation

Tenth meeting 9th January 2004, minutes, presentation

Final project meeting 1st April 2004, minutes, presentation, draft Seminar proposal , Lewis Rossman communication

 

 

 

 

PUBLICATIONS

In press

CCWI 2001 conference. Model mathematics and justification

IWA 2002 World Water conference. Hydraulic interpretation of results from preliminary fieldwork

IWA Scale and Corrosion conference 2003 - Interpretation of physical results from early fieldwork

ASCE EWRI conference 2003 - Results from regeneration study, and comparison to roughness growth rates

CCWI 2003 conference. Rehabilitation and maintenance strategies

J.AWWA 2004 . Hydraulic calibration, diameter and roughness relationships

J. Environmental Engineering ASCE 2005. Initial validatiom of the modelling approach for prediction of discolouration

J. of Water Supply: Research and Technology - AQUA. Transfer of PODDS model to an Australian system

 

 

REPORTS

Laboratory testing of C&T meters

Fieldwork and subsequent modelling from Sandy 5th November 2001 AW01A, and discrete sample analysis AW01B

Fieldwork and subsequent modelling from Keighley K709 17-19th October 2001 YW01A, and discrete sample analysis YW01B

Fieldwork and subsequent modelling from Sandy 5th February 2002 AW02A, and discrete sample analysis AW02B

Fieldwork and subsequent modelling from Sandy 16th May 2002 AW03A, and discrete sample analysis AW03B

Fieldwork and subsequent modelling from Sturton-by-Stow 23rd May to 6th June 2002 AW04A, and discrete sample analysis AW04B

Fieldwork and subsequent modelling from Sandy 8th August 2002 AW05A, and discrete sample analysis AW05B

Fieldwork and subsequent modelling from Sheffield J796 20th August 2002 YW02A, and discrete sample analysis YW02B

Fieldwork and subsequent modeling from Sandy 5th November 2002 AW06A

Fieldwork and subsequent modelling from Thorpe Audlin M277 29th October 2002 YW03A, and discrete sample analysis YW03B

Fieldwork from Ipswich East, Rushmere 15th May 2003 AW07A

Fieldwork and subsequent modelling from Wortley 2nd October 2002 YW04A

Fieldwork and subsequent modelling from Fakenham 18th & 24th February 2003 AW08A

Fieldwork and subsequent modelling from Sheffield J796 19th August 2003 YW05A

Fieldwork and subsequent modeling from Sturton-by-Stow 25th September to 1st October 2003 AW09A

Fieldwork and subsequent modeling from Wortley 8th October 2003 YW06A

Fieldwork and subsequent modeling from Sandy 5th November 2003 AW10A

Fieldwork and subsequent modeling from Fakenham 19th & 24th March 2004 AW11A

 

 

OTHER DOCUMENTS

Project timetable

Contacts list, last updated 3/12/01

Responsive letter to phase 3 servicability indicators

Comment on UKWIR particle sizing report

 
User Area

Password accepted

0